{"id":2032,"date":"2022-03-14T11:02:59","date_gmt":"2022-03-14T11:02:59","guid":{"rendered":"https:\/\/www.graphiteoneinc.com\/?p=2032"},"modified":"2022-03-14T11:02:59","modified_gmt":"2022-03-14T11:02:59","slug":"graphite-one-announces-location-of-its-advanced-graphite-anode-facility","status":"publish","type":"post","link":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/","title":{"rendered":"Graphite One Announces Location of its Advanced Graphite Anode Facility"},"content":{"rendered":"\n<p><strong>March 14, 2022 \u2013 Vancouver, British Columbia \u2013 Graphite One Inc. (GPH: TSX<\/strong><strong>\u2010<\/strong><strong>V; GPHOF: OTCQX) (\u201cGraphite One\u201d or the \u201cCompany\u201d) <\/strong>announced today that Washington State is the chosen location for the Company\u2019s advanced materials processing plant, which will bring battery anode production to the United States.&nbsp;<\/p>\n\n\n\n<p>\u201cThis is a major step towards our 100% U.S.-based advanced graphite supply chain,\u201d said Anthony Huston, President and CEO of Graphite One. \u201cWashington State offers the opportunity for Graphite One to use a green energy source \u2013 Washington state hydro \u2013 to manufacture a green energy material. That\u2019s core to our commitment at Graphite One to make our project a model of ESG in action.\u201d&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p>With energy being the largest single cost factor in advanced graphite anode production, Washington State hydro power is expected to provide Graphite One a significant advantage in keeping its production costs as low as possible. Washington State\u2019s average 2021 electricity price to all industrial customers was 5.81 cents per KWh, compared to the U.S national average of 7.26 per KWh<a href=\"#_ftn1\" id=\"_ftnref1\">[1]<\/a>.<\/p>\n\n\n\n<p>President Joe Biden singled out graphite in his recent video conference on supply chains:<\/p>\n\n\n\n<p>\u201cTo follow through on my commitment to say we were going to make it in America and build it America\u2026 we needed a supply chain that was reliable\u2026\u00a0 including critical materials like lithium, graphite, and rare earth materials, which are badly needed for so many American products.\u201d<a id=\"_ftnref2\" href=\"#_ftn2\">[2]<\/a><\/p>\n\n\n\n<p>Graphite One is in active and ongoing discussions with Washington State public authorities to determine where the facility will be located. The facility is expected to support approximately 130 high-wage jobs.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p>The advanced materials anode manufacturing facility is the downstream link in Graphite One\u2019s 100% U.S.-based advanced graphite supply chain. While the Washington State facility would be engineered to accept multiple feedstocks required for anode production, the anchor source for the facility would be the Company\u2019s resource near Nome, Alaska, which hosts North America\u2019s largest known natural graphite deposit.&nbsp;<\/p>\n\n\n\n<p><strong>Market Awareness Program<\/strong><\/p>\n\n\n\n<p>As part of Graphite One\u2019s ongoing strategy to raise the profile of the Graphite One Project to investors, the Company has entered into an agreement with TD Media LLC dba Life Water Media LLC, of Houston, Texas (\u201cTD Media\u201d) whereby TD Media will provide digital marketing services including content creation, distribution, and market awareness campaigns for a monthly fee of US$100,000 per month for a six (6) month term.&nbsp; The contract can be terminated with 30 days\u2019 written notice. Neither TD Media nor any of its principals currently own any common shares, directly or indirectly, in the Company.<\/p>\n\n\n\n<p><strong>About Graphite One Inc.<\/strong><\/p>\n\n\n\n<p>GRAPHITE ONE INC. (GPH: TSX\u2010V; GPHOF: OTCQB) continues to develop its Graphite One Project (the \u201cProject\u201d), whereby the Company could potentially become an American producer of high-grade anode materials that is integrated with a domestic graphite resource. The Project is proposed as a vertically integrated enterprise to mine, process and manufacture high grade anode materials primarily for the lithium\u2010ion electric vehicle battery market. As set forth in the Company\u2019s Preliminary Economic Assessment, potential graphite mineralization mined from the Company\u2019s Graphite Creek Property, is expected to be processed into concentrate at a graphite processing plant. The proposed processing plant would be located on the Graphite Creek Property situated on the Seward Peninsula about 60 kilometers north of Nome, Alaska. Graphite anodes and other value\u2010added graphite products would be manufactured from the concentrate and other materials at the Company\u2019s proposed advanced graphite materials manufacturing facility expected to be located in Washington State. The Company intends to make a production decision on the Project once a feasibility study is completed.<\/p>\n\n\n\n<p><strong>On Behalf of the Board of Directors<\/strong><\/p>\n\n\n\n<p>&#8220;Anthony Huston\u201d (signed)<\/p>\n\n\n\n<p>For more information on Graphite One Inc., please visit the Company\u2019s website, <a href=\"https:\/\/www.graphiteoneinc.com\/\">www.GraphiteOneInc.com<\/a> or contact:<\/p>\n\n\n\n<p><strong>Anthony Huston<\/strong><br><em>CEO, President &amp; Director<\/em><br>Tel: (604) 889-4251<br>Email: <a href=\"mailto:AHuston@GraphiteOneInc.com\">AHuston@GraphiteOneInc.com<\/a><\/p>\n\n\n\n<p><strong>Investor Relations Contact<\/strong><br>Tel: (604) 684-6730<br><a href=\"http:\/\/GPH@kincommunications.com\">GPH@kincommunications.com<\/a><\/p>\n\n\n\n<p><em>Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.<\/em><\/p>\n\n\n\n<p><strong>FORWARD LOOKING STATEMENTS<\/strong><br><em>All statements in this release, other than statements of historical facts, including those related to the timing and completion of the anticipated Pre-Feasibility Study, future production, establishment of a processing plant and a graphite manufacturing plant, and events or developments that the Company intends, expects, plans, or proposes are forward-looking statements Generally, forward\u2010looking information can be identified by the use of forward\u2010looking terminology such as \u201cproposes\u201d, \u201cexpects\u201d, or \u201cis expected\u201d, \u201cscheduled\u201d, \u201cestimates\u201d, \u201cprojects\u201d, \u201cintends\u201d, \u201cassumes\u201d, \u201cbelieves\u201d, \u201cindicates\u201d or variations of such words and phrases that state that certain actions, events or results \u201cmay\u201d, \u201ccould\u201d, \u201cwould\u201d, \u201cmight\u201d or \u201cwill be taken\u201d, \u201coccur\u201d or \u201cbe achieved\u201d. The Company cautions that there is no certainty that the material processing plant will actually be built, that Washington State public authorities will be supportive of the facility, that the facility will create the anticipated jobs, and tests of the Company\u2019s material will be successful or that such tests will result in the development of successful products. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continuity of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and delays due to third party opposition, changes in government policies regarding mining and natural resource exploration and exploitation, and continued availability of capital and financing, and general economic, market or business conditions. Readers are cautioned not to place undue reliance on this forward-looking information, which is given as of the date it is expressed in this press release, and the Company undertakes no obligation to update publicly or revise any forward-looking information, except as required by applicable securities laws. For more information on the Company, investors should review the Company&#8217;s continuous disclosure filings that are available at <\/em><a href=\"https:\/\/www.sedar.com\/\"><em>www.sedar.com<\/em><\/a><em>.<\/em><\/p>\n\n\n\n<hr class=\"wp-block-separator\"\/>\n\n\n\n<p><a href=\"#_ftnref1\" id=\"_ftn1\">[1]<\/a> U.S. Energy Information Administration; Electric Power Monthly with Data for December 2021; Table 5.6.B. Average Price of Electricity to Ultimate Customers by End-Use Sector, by State<\/p>\n\n\n\n<p><a href=\"#_ftnref2\" id=\"_ftn2\">[2]<\/a> &nbsp;https:\/\/www.whitehouse.gov\/briefing-room\/speeches-remarks\/2022\/02\/22\/remarks-by-president-biden-at-a-virtual-event-on-securing-critical-minerals-for-a-future-made-in-america\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>March 14, 2022 \u2013 Vancouver, British Columbia \u2013 Graphite One Inc. (GPH: TSX\u2010V; GPHOF: OTCQX) (\u201cGraphite One\u201d or the \u201cCompany\u201d) announced today that Washington State is the chosen location for the Company\u2019s advanced materials processing plant, which will bring battery anode production to the United States.&nbsp; \u201cThis is a major step towards our 100% U.S.-based &hellip; <a href=\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/\">Continued<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-2032","post","type-post","status-publish","format-standard","hentry","category-company-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Graphite One Announces Location of its Advanced Graphite Anode Facility - Graphite One<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Graphite One Announces Location of its Advanced Graphite Anode Facility - Graphite One\" \/>\n<meta property=\"og:description\" content=\"March 14, 2022 \u2013 Vancouver, British Columbia \u2013 Graphite One Inc. (GPH: TSX\u2010V; GPHOF: OTCQX) (\u201cGraphite One\u201d or the \u201cCompany\u201d) announced today that Washington State is the chosen location for the Company\u2019s advanced materials processing plant, which will bring battery anode production to the United States.&nbsp; \u201cThis is a major step towards our 100% U.S.-based &hellip; Continued\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"Graphite One\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-14T11:02:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.graphiteoneinc.com\/OLD\/wp-content\/uploads\/2021\/11\/og-share-image.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"627\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"blender\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#organization\",\"name\":\"Graphite One\",\"url\":\"https:\/\/www.graphiteoneinc.com\/OLD\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/live-graphite-one.pantheonsite.io\/wp-content\/uploads\/2021\/11\/g1-logo-full.png\",\"contentUrl\":\"https:\/\/live-graphite-one.pantheonsite.io\/wp-content\/uploads\/2021\/11\/g1-logo-full.png\",\"width\":1189,\"height\":160,\"caption\":\"Graphite One\"},\"image\":{\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#website\",\"url\":\"https:\/\/www.graphiteoneinc.com\/OLD\/\",\"name\":\"Graphite One\",\"description\":\"Tech Materials for Global Ingenuity.\",\"publisher\":{\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.graphiteoneinc.com\/OLD\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#webpage\",\"url\":\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/\",\"name\":\"Graphite One Announces Location of its Advanced Graphite Anode Facility - Graphite One\",\"isPartOf\":{\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#website\"},\"datePublished\":\"2022-03-14T11:02:59+00:00\",\"dateModified\":\"2022-03-14T11:02:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.graphiteoneinc.com\/OLD\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Graphite One Announces Location of its Advanced Graphite Anode Facility\"}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#webpage\"},\"author\":{\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#\/schema\/person\/c5752be5692fa87e599c6ec5918fe68e\"},\"headline\":\"Graphite One Announces Location of its Advanced Graphite Anode Facility\",\"datePublished\":\"2022-03-14T11:02:59+00:00\",\"dateModified\":\"2022-03-14T11:02:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#webpage\"},\"wordCount\":1074,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#organization\"},\"articleSection\":[\"Company News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#respond\"]}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#\/schema\/person\/c5752be5692fa87e599c6ec5918fe68e\",\"name\":\"blender\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.graphiteoneinc.com\/OLD\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5176f315bf6640bd6aa9a85843f0910ddffe5f764c44959404de97d33aefb2fb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5176f315bf6640bd6aa9a85843f0910ddffe5f764c44959404de97d33aefb2fb?s=96&d=mm&r=g\",\"caption\":\"blender\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Graphite One Announces Location of its Advanced Graphite Anode Facility - Graphite One","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/","og_locale":"en_US","og_type":"article","og_title":"Graphite One Announces Location of its Advanced Graphite Anode Facility - Graphite One","og_description":"March 14, 2022 \u2013 Vancouver, British Columbia \u2013 Graphite One Inc. (GPH: TSX\u2010V; GPHOF: OTCQX) (\u201cGraphite One\u201d or the \u201cCompany\u201d) announced today that Washington State is the chosen location for the Company\u2019s advanced materials processing plant, which will bring battery anode production to the United States.&nbsp; \u201cThis is a major step towards our 100% U.S.-based &hellip; Continued","og_url":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/","og_site_name":"Graphite One","article_published_time":"2022-03-14T11:02:59+00:00","og_image":[{"width":1200,"height":627,"url":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-content\/uploads\/2021\/11\/og-share-image.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"blender","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#organization","name":"Graphite One","url":"https:\/\/www.graphiteoneinc.com\/OLD\/","sameAs":[],"logo":{"@type":"ImageObject","@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#logo","inLanguage":"en-US","url":"https:\/\/live-graphite-one.pantheonsite.io\/wp-content\/uploads\/2021\/11\/g1-logo-full.png","contentUrl":"https:\/\/live-graphite-one.pantheonsite.io\/wp-content\/uploads\/2021\/11\/g1-logo-full.png","width":1189,"height":160,"caption":"Graphite One"},"image":{"@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#logo"}},{"@type":"WebSite","@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#website","url":"https:\/\/www.graphiteoneinc.com\/OLD\/","name":"Graphite One","description":"Tech Materials for Global Ingenuity.","publisher":{"@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.graphiteoneinc.com\/OLD\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#webpage","url":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/","name":"Graphite One Announces Location of its Advanced Graphite Anode Facility - Graphite One","isPartOf":{"@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#website"},"datePublished":"2022-03-14T11:02:59+00:00","dateModified":"2022-03-14T11:02:59+00:00","breadcrumb":{"@id":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.graphiteoneinc.com\/OLD\/"},{"@type":"ListItem","position":2,"name":"Graphite One Announces Location of its Advanced Graphite Anode Facility"}]},{"@type":"Article","@id":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#article","isPartOf":{"@id":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#webpage"},"author":{"@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#\/schema\/person\/c5752be5692fa87e599c6ec5918fe68e"},"headline":"Graphite One Announces Location of its Advanced Graphite Anode Facility","datePublished":"2022-03-14T11:02:59+00:00","dateModified":"2022-03-14T11:02:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#webpage"},"wordCount":1074,"commentCount":0,"publisher":{"@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#organization"},"articleSection":["Company News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.graphiteoneinc.com\/OLD\/graphite-one-announces-location-of-its-advanced-graphite-anode-facility\/#respond"]}]},{"@type":"Person","@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#\/schema\/person\/c5752be5692fa87e599c6ec5918fe68e","name":"blender","image":{"@type":"ImageObject","@id":"https:\/\/www.graphiteoneinc.com\/OLD\/#personlogo","inLanguage":"en-US","url":"https:\/\/secure.gravatar.com\/avatar\/5176f315bf6640bd6aa9a85843f0910ddffe5f764c44959404de97d33aefb2fb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5176f315bf6640bd6aa9a85843f0910ddffe5f764c44959404de97d33aefb2fb?s=96&d=mm&r=g","caption":"blender"}}]}},"_links":{"self":[{"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/posts\/2032","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/comments?post=2032"}],"version-history":[{"count":2,"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/posts\/2032\/revisions"}],"predecessor-version":[{"id":2034,"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/posts\/2032\/revisions\/2034"}],"wp:attachment":[{"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/media?parent=2032"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/categories?post=2032"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.graphiteoneinc.com\/OLD\/wp-json\/wp\/v2\/tags?post=2032"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}