Graphite One’s feasibility study shows a pre-tax NPV of $6.4 billion, 30% IRR, 7.3 years payback, and 20-year mine life.

$6.4B
NPV pre-tax
  • Pre-tax net present value of $6.4 billion
  • Post-tax net present value of $5.0 billion
30%
IRR pre-tax
  • Pre-tax 30% internal rate of return (8% discount rate) with a payback period of 7.3 years
  • Post-tax internal rate of return of 27% (8% discount rate) and a payback period of 7.5 years
22-yr
Project Life
  • The FS assumes the anode manufacturing facility’s operational life is 22 years, based on a startup with purchased graphite and continued operation with graphite from G1’s Graphite Creek Mine
  • The average production over 20 years in the FS is 175,000 tonnes of graphite concentrate and at capacity, annual production of 256,510 tonnes of anode active materials, purified and unpurified products over 22 years
  • Project life based on exploration of 1.2 miles (12%) of the total 9.5 mile long geophysical anomaly

Feasibility Study Report

Download the Full Report